How long does it take to replace a roof?
A straightforward domestic re-roof may take several days to around a week, while larger or more complicated roofs can take longer. Weather, structural repairs, scaffolding, roof complexity and material availability can all affect the programme.
What sets the programme
Duration depends on the size and complexity of the roof, the covering, the weather and how much preparation is needed before work starts, including scaffolding.
Strip and re-cover work is weather-dependent by nature, because the roof is opened up in stages and has to be made safe at the end of each working day.
What to expect while work is under way
Expect scaffolding for the duration, skips or a collection arrangement for the old covering, and noise during stripping. Access to parts of the garden or drive is usually affected.
A contractor should tell you the intended sequence and how the roof will be protected overnight and in bad weather.